Project Completion Certificate (Ground Water)
Scheme ID: 20025305 Name of Scheme: Bacheet Purwa No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4971 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 14-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 4/180.31 BACHEET PURWA 26.565401 79.844556
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1150/64 BACHEET PURWA 26.565401 79.844556
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325/18 BACHEET PURWA 26.565401 79.844556
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.276
2 HDPE 90 2.071
3 HDPE 110 0.484
4 HDPE 125 1.999
5 HDPE 140 2.753
6 HDPE 160 0.966
7 HDPE 180 0.080
HSC Connection
Sno. Total Nos.
1 1043
Other Details
4.95
0.00
4.05
01-Sep-2024
02-Sep-2024