Project Completion Certificate (Ground Water)
Scheme ID: 20024374 Name of Scheme: Bamhanauti No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.02/128.53 Bamhanuti 26.29777 79.852373
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 39.10/62 Bamhanuti 26.29777 79.852373
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Bamhanuti 26.29777 79.852373
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.666 As per Site
2 HDPE 75 0.533 As per Site
3 HDPE 90 0.526 As per Site
4 HDPE 110 0.261 As per Site
5 HDPE 140 0.416 As per Site
HSC Connection
Sno. Total Nos.
1 404
Other Details
1.50
1.81
1.81
31-Aug-2023
01-Sep-2023