Project Completion Certificate (Ground Water)
Scheme ID: 20023894 Name of Scheme: Anawa Wss No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/85.19 ANAWA 28.003882 80.084341
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 40.32 M3 / 45 M ANAWA 28.003882 80.084341
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200 KL-16 M ANAWA 28.003835 80.084340
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 3.843
2 HDPE / 6Kg 75 0.657
3 HDPE / 6Kg 90 0.697
4 HDPE / 6Kg 110 0.193
5 HDPE / 6Kg 140 0.060
6 HDPE / 6Kg 160 0.289
HSC Connection
Sno. Total Nos.
1 544
Other Details
2.05
0.00
2.05
30-Dec-2023
06-Dec-2024