| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023421 | Name of Scheme: ATIRAJPUR GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2190 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 10-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM DIA SLOTTED PIPE | 15 | ATIRAJPUR | 27.12755 | 79.533954 |
| 2 | 200 MM DIA PLAIN PIPE | 60.16 | ATIRAJPUR | 27.12755 | 79.533954 |
| 3 | 150 MM DIA PLAIN PIPE | 78.34 | ATIRAJPUR | 27.12755 | 79.533954 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 452/62 | ATIRAJPUR | 27.12755 | 79.533954 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150/16 | ATIRAJPUR | 27.12755 | 79.533954 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution Pipe/HDPE | 63 | 2.3 | |
| 2 | Distribution Pipe/HDPE | 75 | 0.249 | |
| 3 | Distribution Pipe/HDPE | 90 | .377 | |
| 4 | Distribution Pipe/HDPE | 110 | 0.177 | |
| 5 | Distribution Pipe/HDPE | 125 | 0.145 | |
| 6 | Distribution Pipe/HDPE | 140 | 0.038 | |
| 7 | Distribution Pipe/HDPE | 160 | 0.419 | |
| 8 | Distribution Pipe/HDPE | 200 | 0.039 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 456 |