| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022694 | Name of Scheme: Birondi Tajpur | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4923 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 24-Feb-2024 | Actual Date of Completion (Capex): 07-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 30.14 M/98.44 M | Birondi Tajpur | 28.346745 | 77.784981 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1100 LPM/52 M | Birondi Tajpur | 28.346745 | 77.784981 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT- 1 | 325 KL/16 M | Birondi Tajpur | 28.346713 | 77.784676 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 200 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.82 | |
| 2 | HDPE | 75 | 0.84 | |
| 3 | HDPE | 90 | 0.27 | |
| 4 | HDPE | 110 | 0.072 | |
| 5 | HDPE | 125 | 0.19 | |
| 6 | HDPE | 180 | 0.64 | |
| 7 | HDPE | 200 | 0.39 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 884 |