| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022642 | Name of Scheme: MAHULANI GP WSS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1639 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2026 | Actual Date of Completion (Capex): 15-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 144.97 | MAHULANI | 27.2642 | 83.1098 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 350LPM/41M | MAHULANI | 27.2041 | 83.0545 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 KL/12 M | MAHULANI | 27.3621 | 83.0935 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 80 | 25 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PE 100 PN 6/HDPE | 63 | 2983 | |
| 2 | PE 100 PN 6/HDPE | 75 | 112 | |
| 3 | PE 100 PN 6/HDPE | 90 | 244 | |
| 4 | PE 100 PN 6/HDPE | 110 | 217 | |
| 5 | PE 100 PN 6/HDPE | 125 | 208 | |
| 6 | PE 100 PN 6/HDPE | 140 | 187 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 202 |