| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022480 | Name of Scheme: MALAGARH | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5829 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2024 | Actual Date of Completion (Capex): 30-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 36.04 M / 81.74 M | Malagarh | 28.462810 | 77.839980 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1120 LPM / 51 M | Malagarh | 28.43991 | 77.878537 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 325 KL / 14 M | Malagarh | 28.462791 | 77.840103 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 12.88 | |
| 2 | HDPE | 75 | 0.86 | |
| 3 | HDPE | 90 | 1.01 | |
| 4 | HDPE | 110 | 0.25 | |
| 5 | HDPE | 125 | 0.059 | |
| 6 | HDPE | 140 | 0.005 | |
| 7 | HDPE | 160 | 0.058 | |
| 8 | HDPE | 200 | 0.13 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 996 |