Project Completion Certificate (Ground Water)
Scheme ID: 20022476 Name of Scheme: MANAKPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2024 Actual Date of Completion (Capex): 25-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33 M / 86.96 M Manakpur 28.562749 77.858631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 660 LPM / 49 M Manakpur 28.562749 77.858631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 Kl / 12M Manakpur 28.562873 77.858704
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.92
2 HDPE 75 0.067
3 HDPE 90 0.077
4 HDPE 110 0.10
5 HDPE 125 0.11
6 HDPE 140 0.76
7 HDPE 160 2.92
HSC Connection
Sno. Total Nos.
1 501
Other Details
1.88
1.76
1.79
10-Dec-2025
11-Dec-2025