Project Completion Certificate (Ground Water)
Scheme ID: 20022199 Name of Scheme: Murela No. of Villages: 3 No. of Habitation Covered: 11
Total Population Covered: 4978 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 13-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 300X200 12.00/72.50 Murela 25.899243 82.660126
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25 HP 1100/51.30 Murela 25.899243 82.660126
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/16 Murela 25.899102 82.660111
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.01425
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 1.026
2 HDPE PIPE PN-6 160 1.046
3 HDPE PIPE PN-6 140 0.105
4 HDPE PIPE PN-6 110 0.835
5 HDPE PIPE PN-6 75 1.339
6 HDPE PIPE PN-6 63 14.178
7 HDPE PIPE PN-6 90 1.513
HSC Connection
Sno. Total Nos.
1 508
Other Details
3.53
3.34
2.85
13-Oct-2025
14-Oct-2025