Project Completion Certificate (Ground Water)
Scheme ID: 20022191 Name of Scheme: Sarai Bikram No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 5480 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 18-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 51/156.80 Sarai Bikram 25.564508 82.541325
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1100/49.70 Sarai Bikram 25.564508 82.541325
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/14 Sarai Bikram 25.564333 82.541481
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.406
2 HDPE PIPE PN-6 160 0.837
3 HDPE PIPE PN-6 140 0.701
4 HDPE PIPE PN-6 110 0.605
5 HDPE PIPE PN-6 90 0.362
6 HDPE PIPE PN-6 75 0.979
7 HDPE PIPE PN-6 63 9.110
HSC Connection
Sno. Total Nos.
1 740
Other Details
2.87
2.69
2.59
18-Oct-2025
19-Oct-2025