Project Completion Certificate (Ground Water)
Scheme ID: 20021820 Name of Scheme: RAMNAGAR No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1878 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2026 Actual Date of Completion (Capex): 16-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 152.50 RAMNAGAR 27.2882 83.1610
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500LPM/41M RAMNAGAR 27.2625 83.0545
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/12M RAMNAGAR 27.3621 82.7556
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K9 100 37.48
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE 100 PN 6/HDPE 63 4107
2 PE 100 PN 6/HDPE 75 1012
3 PE 100 PN 6/HDPE 110 477
4 PE 100 PN 6/HDPE 125 149
5 PE 100 PN 6/HDPE 140 390
HSC Connection
Sno. Total Nos.
1 358
Other Details
172.07
166.58
153.26
15-Jan-2026
20-Jan-2026