Project Completion Certificate (Ground Water)
Scheme ID: 20021708 Name of Scheme: Karaunda Hati Village Water Supply Scheme Reorgination No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6273 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2024 Actual Date of Completion (Capex): 15-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 MM 120 MTR PLAIN PIPE OHT CAMPUS 29.46597 77.398503
2 200 MM 80 MTR PLAIN PIPE OHT CAMPUS 29.46597 77.398503
3 200 MM 100 MTR SLOTTED PIE OHT CAMPUS 29.46597 77.398503
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP 600 M/ HEAD (53 MTR) OHT CAMPUS 29.46597 29.46597
2 15 HP 600 M/ HEAD (53 MTR) NEW OHT CAMPUS 29.46597 77.398503
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 CONCRETE 150 KL/ 12 MTR OHT CAMPUS 29.46597 77.398503
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.0215
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.5648
2 HDPE 75 1.0308
3 HDPE 90 0.1081
4 HDPE 110 0.4227
5 HDPE 125 0.3357
6 HDPE 140 0.2897
7 HDPE 160 00.151
HSC Connection
Sno. Total Nos.
1 1141
Other Details
440.19
433.87
417.07
15-Sep-2024
15-Jan-2025