Project Completion Certificate (Ground Water)
Scheme ID: 20021188 Name of Scheme: Samopur No. of Villages: 3 No. of Habitation Covered: 12
Total Population Covered: 3028 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2023 Actual Date of Completion (Capex): 18-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 300X150 18.04/140.09 Samopur 25.679142 82.75504
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-15 HP 700/46.10 Samopur 25.679142 82.75504
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/12 Samopur 25.679194 82.755257
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 160 0.366
2 HDPE PIPE PN-6 140 0.711
3 HDPE PIPE PN-6 90 1.362
4 HDPE PIPE PN-6 75 1.752
5 HDPE PIPE PN-6 63 11.234
HSC Connection
Sno. Total Nos.
1 480
Other Details
2.55
2.38
2.12
18-Oct-2025
19-Oct-2025