Project Completion Certificate (Ground Water)
Scheme ID: 20021090 Name of Scheme: Lalmanpur No. of Villages: 7 No. of Habitation Covered: 16
Total Population Covered: 5663 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2023 Actual Date of Completion (Capex): 10-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 9.11/46 Lalmanpur 25.809993 82.659956
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1200/52.00 Lalmanpur 25.809993 82.659956
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350/16 Lalmanpur 25.809928 82.659931
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.061
2 HDPE PIPE PN-6 160 0.297
3 HDPE PIPE PN-6 140 1.790
4 HDPE PIPE PN-6 110 2.614
5 HDPE PIPE PN-6 90 2.451
6 HDPE PIPE PN-6 75 2.279
7 HDPE PIPE PN-6 63 18.718
HSC Connection
Sno. Total Nos.
1 764
Other Details
4.16
4.06
3.80
18-Sep-2025
19-Sep-2025