| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20021090 | Name of Scheme: Lalmanpur | No. of Villages: 7 | No. of Habitation Covered: 16 |
| Total Population Covered: 5663 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Sep-2023 | Actual Date of Completion (Capex): 10-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 9.11/46 | Lalmanpur | 25.809993 | 82.659956 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-25HP | 1200/52.00 | Lalmanpur | 25.809993 | 82.659956 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350/16 | Lalmanpur | 25.809928 | 82.659931 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.061 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.297 | |
| 3 | HDPE PIPE PN-6 | 140 | 1.790 | |
| 4 | HDPE PIPE PN-6 | 110 | 2.614 | |
| 5 | HDPE PIPE PN-6 | 90 | 2.451 | |
| 6 | HDPE PIPE PN-6 | 75 | 2.279 | |
| 7 | HDPE PIPE PN-6 | 63 | 18.718 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 764 |