Project Completion Certificate (Ground Water)
Scheme ID: 20021018 Name of Scheme: SHAHPUR BINORA. No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4730 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 17-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.03 M/ 110.84 M SHAHPUR BINORA 27.541868 80.21515
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.02 M³ per Min /45Mtr SHAHPUR BINORA 27.541868 80.21515
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 16 Mtr SHAHPUR BINORA 27.542001 80.214935
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02144
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.632
2 HDPE Pipe PN-6, Class PE-100 75 3.446
3 HDPE Pipe PN-6, Class PE-100 90 1.915
4 HDPE Pipe PN-6, Class PE-100 110 1.585
5 HDPE Pipe PN-6, Class PE-100 125 2.742
6 HDPE Pipe PN-6, Class PE-100 160 0.497
7 HDPE Pipe PN-6, Class PE-100 180 1.692
8 HDPE Pipe PN-6, Class PE-100 200 0.973
HSC Connection
Sno. Total Nos.
1 630
Other Details
3.63
0.00
3.50
16-Jul-2023
24-Dec-2024