| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020928 | Name of Scheme: Jarauta | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2580 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X150 | 36/181.80 | Jarauta | 25.585485 | 82.495456 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-12.5HP | 550/47.80 | Jarauta | 25.585485 | 82.495456 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/12 | Jarauta | 25.58543 | 82.495446 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 1.112 | |
| 2 | HDPE PIPE PN-6 | 110 | 0.532 | |
| 3 | HDPE PIPE PN-6 | 90 | 0.284 | |
| 4 | HDPE PIPE PN-6 | 75 | 1.414 | |
| 5 | HDPE PIPE PN-6 | 63 | 6.372 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 344 |