Project Completion Certificate (Ground Water)
Scheme ID: 20020928 Name of Scheme: Jarauta No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2580 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 13-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X150 36/181.80 Jarauta 25.585485 82.495456
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-12.5HP 550/47.80 Jarauta 25.585485 82.495456
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/12 Jarauta 25.58543 82.495446
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 160 1.112
2 HDPE PIPE PN-6 110 0.532
3 HDPE PIPE PN-6 90 0.284
4 HDPE PIPE PN-6 75 1.414
5 HDPE PIPE PN-6 63 6.372
HSC Connection
Sno. Total Nos.
1 344
Other Details
2.16
2.00
1.98
13-Oct-2025
14-Oct-2025