| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020841 | Name of Scheme: DABTHLA & MAVI | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 4448 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 17-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.15 Mtr / 105.11 Mtr | DABTHLA & MAVI | 28.948871 | 77.908691 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 900 LPM / 54 Mtr | DABTHLA & MAVI | 28.948871 | 77.908691 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 Kl / 16 M | DABTHLA & MAVI | 28.948871 | 77.908691 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.898 | |
| 2 | HDPE | 90 | 1.556 | |
| 3 | HDPE | 110 | 0.222 | |
| 4 | HDPE | 140 | 1.4164 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 655 |