Project Completion Certificate (Ground Water)
Scheme ID: 20019813 Name of Scheme: Patauna No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2110 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 04-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.04 /85.87 PATAUNA 26º 23' 36.99" N 82º 27' 07.75" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 27/47 PATAUNA 26º 23' 36.99" N 82º 27' 07.75" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 125/16 PATAUNA 26º 23' 36.99" N 82º 27' 07.75" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 80 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 11.7
2 HDPE Pipe PN-6: Class PE-100 75 0.451
3 HDPE Pipe PN-6: Class PE-100 90 0.200
4 HDPE Pipe PN-6: Class PE-100 110 0.839
HSC Connection
Sno. Total Nos.
1 388
Other Details
1.77
0.00
0.00
17-Jan-2026
18-Jan-2026