Project Completion Certificate (Ground Water)
Scheme ID: 20019645 Name of Scheme: Kazipur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3830 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.00/92.80 KAZIPUR 27.954743 79.916098
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 49.80 M3 / 41 M KAZIPUR 27.954743 79.916098
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 225 KL-12 M KAZIPUR 27.954675 79.916229
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 5.890
2 HDPE / 6Kg 75 0.768
3 HDPE / 6Kg 90 0.138
4 HDPE / 6Kg 110 0.175
5 HDPE / 6Kg 140 0.232
6 HDPE / 6Kg 160 0.123
7 HDPE / 6Kg 180 0.245
HSC Connection
Sno. Total Nos.
1 664
Other Details
2.13
0.00
2.13
15-Feb-2024
06-Dec-2024