Scheme ID: 20019498 Name of Scheme: RAMWAPUR NANKAR GP water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2145 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Dec-2026 Actual Date of Completion (Capex): 15-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 177.48 RAMWAPUR NANKAR 27.2025 83.1028
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500LPM/41M RAMWAPUR NANKAR 27.2625 83.0926
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/12M RAMWAPUR NANKAR 27.2996 83.2666
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K9 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE 100 PN 6/HDPE 63 3027
2 PE 100 PN 6/HDPE 75 316
3 PE 100 PN 6/HDPE 90 422
4 PE 100 PN 6/HDPE 110 178
5 PE 100 PN 6/HDPE 125 254
HSC Connection
Sno. Total Nos.
1 318
Other Details
148.02
141.76
138.71
15-Jan-2025
01-Feb-2025