Project Completion Certificate (Ground Water)
Scheme ID: 20019388 Name of Scheme: Kodupura Water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1996 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Jul-2025 Actual Date of Completion (Capex): 31-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL 15m/117.84m KODIPURA 29.331977 78.516958
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.5 HP 500 lpm /44m KODIPURA 29.331977 78.516958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150kl/14m KODIPURA 29.331977 78.516958
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 3.29
2 HDPE PIPE PN-6: CLASS PE-100 75 0.52
3 HDPE PIPE PN-6: CLASS PE-100 90 0.21
4 HDPE PIPE PN-6: CLASS PE-100 110 0.13
5 HDPE PIPE PN-6: CLASS PE-100 125 0.18
HSC Connection
Sno. Total Nos.
1 470
Other Details
1.68
1.68
1.65
31-Jul-2025
01-Aug-2025