| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018380 | Name of Scheme: Dehariyawan Water supply | No. of Villages: 1 | No. of Habitation Covered: 9 |
| Total Population Covered: 5240 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Mar-2023 | Actual Date of Completion (Capex): 31-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.00/122 | Dehirywan | 1st -26.469313 , 2nd- 26.473412 | 1st -81.826827,2nd - 81.828072 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 525 LPM / 45 M | Dehirywan | 1st -26.469313 , 2nd- 26.473412 | 1st -81.826827,2nd - 81.828072 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 314 KL / 14 M | Dehirywan | 26.469308 | 81.826694 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 100 | 0.550 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 932 |