Project Completion Certificate (Ground Water)
Scheme ID: 20018230 Name of Scheme: Binaika(Vinaika) Water supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2958 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Jan-2026 Actual Date of Completion (Capex): 15-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 157.65 VINAIKA 27.2882 83.1098
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700 LPM / 43 M VINAIKA 27.3115 83.1299
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/12 M VINAIKA 27.3621 83.0935
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K9 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PE 100 PN 6/HDPE 63 5052
2 PE 100 PN 6/HDPE 75 212
3 PE 100 PN 6/HDPE 90 851
4 PE 100 PN 6/HDPE 110 183
5 PE 100 PN 6/HDPE 140 158
6 PE 100 PN 6/HDPE 160 130
HSC Connection
Sno. Total Nos.
1 515
Other Details
199.22
172.94
199.09
15-Jan-2025
05-Feb-2025