Project Completion Certificate (Ground Water)
Scheme ID: 20017934 Name of Scheme: GOVINDAPUR CHITTAURA PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3478 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 25-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.96/238.5 GOVINDAPUR 27.53217 81.674113
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 27/35 GOVINDAPUR 27.53217 81.674113
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 GOVINDAPUR 27.532256 81.674144
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 150 0.0438
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 5.855
2 HDPE Pipe PN-6; Class PE-100 75 0.521
3 HDPE Pipe PN-6; Class PE-100 90 0.029
4 HDPE Pipe PN-6; Class PE-100 110 0.752
5 HDPE Pipe PN-6; Class PE-100 125 0.190
6 HDPE Pipe PN-6; Class PE-100 140 0.187
HSC Connection
Sno. Total Nos.
1 325
Other Details
1.79
1.79
1.72
25-Nov-2025
26-Nov-2025