| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017124 | Name of Scheme: Bagarpur Grahi Water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3404 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Nov-2021 | Actual Date of Completion (Capex): 06-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.00 MTR / 121.25 MTR | BAGARPUR GHARI | 29.444718 | 78.096088 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 12.50 HP | 500 LPM / 49 MTR | BAGARPUR GHARI | 29.444718 | 78.096088 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 MTR | BAGARPUR GHARI | 29.444718 | 78.096088 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 100 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-06 CLASS PE-100 | 110 | 0.038 | |
| 2 | HDPE PIPE PN-06 CLASS PE-100 | 90 | 0.513 | |
| 3 | HDPE PIPE PN-06 CLASS PE-100 | 75 | 0.138 | |
| 4 | HDPE PIPE PN-06 CLASS PE-100 | 63 | 4.964 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 356 |