Project Completion Certificate (Ground Water)
Scheme ID: 20016901 Name of Scheme: Murlipur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21.06/162.02 Murlipur 26.286504 79.879539
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 26.4/66 Murlipur 26.286504 79.879539
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 Murlipur 26.286504 79.879539
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.415
2 HDPE 75 0.143
3 HDPE 90 0.482
4 HDPE 110 1.234
5 HDPE 140 .0100
HSC Connection
Sno. Total Nos.
1 456
Other Details
1.58
1.95
1.95
31-Dec-2023
01-Jan-2024