Project Completion Certificate (Ground Water)
Scheme ID: 20016383 Name of Scheme: DHUKURI BUZURG No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2480 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/105.93 DHUKURI BUZURG 28.201602 80.032812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 33.12/45 DHUKURI BUZURG 28.201602 80.032812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/16 DHUKURI BUZURG 28.201718 80.032878
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.069
2 HDPE / 6KG 75 3.230
3 HDPE / 6KG 90 0.666
4 HDPE / 6KG 110 0.094
5 HDPE / 6KG 140 0.086
6 HDPE / 6KG 160 0.969
HSC Connection
Sno. Total Nos.
1 421
Other Details
2.20
0.00
2.19
30-Dec-2023
06-Dec-2024