Project Completion Certificate (Ground Water)
Scheme ID: 20016242 Name of Scheme: Rampur Ta Jakhaniyan No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 5328 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 28-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 48.27/166.04 Rampur Ta Jakhaniya 25.632841 82.194112
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-25HP 1200/50 Rampur Ta Jakhaniya 25.632841 82.194112
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350/14 Rampur Ta Jakhaniya 25.632879 82.194107
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.044
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.410
2 HDPE PIPE PN-6 160 0.950
3 HDPE PIPE PN-6 140 1.696
4 HDPE PIPE PN-6 110 1.685
5 HDPE PIPE PN-6 90 0.925
6 HDPE PIPE PN-6 75 1.756
7 HDPE PIPE PN-6 63 18.273
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.68
3.50
3.49
28-Feb-2025
01-Mar-2025