| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015921 | Name of Scheme: Babupur Buzurg | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 5210 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 26-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 33.33/90.18 | BABUPPUR BUZURG | 27.992461 | 79.644319 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 69.84M3/43M | BABUPPUR BUZURG | 27.992461 | 79.644319 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL-14M | BABUPPUR BUZURG | 27.992559 | 79.644397 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 6.701 | |
| 2 | HDPE/6KG | 75 | 0.487 | |
| 3 | HDPE/6KG | 90 | 0.702 | |
| 4 | HDPE/6KG | 110 | 4.411 | |
| 5 | HDPE/6KG | 140 | 2.440 | |
| 6 | HDPE/6KG | 160 | 1.461 | |
| 7 | HDPE/6KG | 180 | 0.157 | |
| 8 | HDPE/6KG | 200 | 0.257 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1020 |