Project Completion Certificate (Ground Water)
Scheme ID: 20015832 Name of Scheme: Sunara Buzurg No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23.04/103.43 SUNARA BUZURG 28.081670 80.048227
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 31.32/43 SUNARA BUZURG 28.081670 80.048227
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150/12 SUNARA BUZURG 28.081628 80.048143
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.355
2 HDPE / 6KG 75 0.104
3 HDPE / 6KG 90 0.960
4 HDPE / 6KG 110 0.808
5 HDPE / 6KG 140 0.124
6 HDPE / 6KG 160 0.230
HSC Connection
Sno. Total Nos.
1 450
Other Details
1.85
0.00
1.85
30-Nov-2023
06-Dec-2024