| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015740 | Name of Scheme: BARSAWAN WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 2650 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Mar-2023 | Actual Date of Completion (Capex): 31-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12.01/87.02 | Barsawan | 26.428378 | 81.92222 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 550 LPM / 45 M | Barsawan | 26.428378 | 81.92222 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL / 16 M | Barsawan | 26.144951 | 82.162631 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 125 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 9.55 | |
| 2 | HDPE / PN-6: Class PE-100 | 160 | 1.91 | |
| 3 | HDPE / PN-6: Class PE-100 | 140 | 1.66 | |
| 4 | HDPE / PN-6: Class PE-100 | 125 | .5 | |
| 5 | HDPE / PN-6: Class PE-100 | 110 | .73 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 427 |