Project Completion Certificate (Ground Water)
Scheme ID: 20015712 Name of Scheme: SARAI KAYAM GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1940 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 04-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 150mm Dia 64.54 Saray kayam 27.030807 79.434947
2 Plain Pipe 200mm Dia 60.3 Saray kayam 27.030807 79.434947
3 Slotted Pipe 150mm Dia 15 Saray kayam 27.030807 79.434947
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 429/58 Saray kayam 27.030807 79.434947
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-AL Tank 125/12 Saray kayam 27.030807 79.434947
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Distribution Pipe/HDPE 63 3.822
2 Distribution Pipe/HDPE 75 0.400
3 Distribution Pipe/HDPE 110 3.416
4 Distribution Pipe/HDPE 125 0.315
5 Distribution Pipe/HDPE 180 0.160
HSC Connection
Sno. Total Nos.
1 335
Other Details
2.04
2.15
0.00
04-Aug-2025
05-Aug-2025