Project Completion Certificate (Ground Water)
Scheme ID: 20015657 Name of Scheme: luhichi No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2450 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.04/92.33 luhichi 28.306801 80.015172
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT pump-1 30.96/45 M luhichi 28.306801 80.015172
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 oht-1 150kl-16m luhichi 28.306801 80.015172
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 125 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6 Kg 63 6.847
2 HDPE/6 Kg 75 0.732
3 HDPE/6 Kg 90 0.212
4 HDPE/6 Kg 110 0.933
5 HDPE/6 Kg 140 1.480
6 HDPE/6 Kg 160 0.020
HSC Connection
Sno. Total Nos.
1 445
Other Details
2.11
0.00
2.11
30-Dec-2023
06-Dec-2024