Project Completion Certificate (Ground Water)
Scheme ID: 20015579 Name of Scheme: Afatipur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2070 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.05/67.36 AFATIPUR 27.714597 79.724447
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 25.02/45 AFATIPUR 27.714597 79.724447
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 125/16 AFATIPUR 27.714523 79.724248
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 7.723
2 HDPE / 6KG 75 0.624
3 HDPE / 6KG 90 1.726
4 HDPE / 6KG 110 1.216
5 HDPE / 6KG 140 0.090
HSC Connection
Sno. Total Nos.
1 356
Other Details
2.34
0.00
2.16
30-Dec-2023
06-Dec-2024