Scheme ID: 20015209 Name of Scheme: BADRIPUR HADIRA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.07 / 78.21 BADRIPUR HADIRA 28.071417 80.036061
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 30.6 M3 / 45 M BADRIPUR HADIRA 28.071417 80.036061
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL - 16 M BADRIPUR HADIRA 28.071380 80.036020
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K 7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.815
2 HDPE / 6KG 75 0.155
3 HDPE / 6KG 90 1.557
4 HDPE / 6KG 140 0.135
5 HDPE / 6KG 160 0.018
HSC Connection
Sno. Total Nos.
Other Details
2.03
0.00
1.95
30-Nov-2023
06-Dec-2024