Project Completion Certificate (Ground Water)
Scheme ID: 20015138 Name of Scheme: GULAULI POWAYAN W/S No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 1926 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15.93/82.50 GULAULI 28.161680 80.033522
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 23.04/43 GULAULI 28.161680 80.033522
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 100/12 GULAULI 28.161691 80.033463
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 8.974
2 HDPE/6KG 75 0.942
3 HDPE/6KG 90 1.985
4 HDPE/6KG 110 0.940
5 HDPE/6KG 140 0.019
HSC Connection
Sno. Total Nos.
1 385
Other Details
2.07
0.00
2.03
30-Dec-2023
06-Dec-2024