| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015034 | Name of Scheme: Kathamau | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 3455 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 17-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBWELL | 151.17 MTR /24 MTR | KATHAMAU | 26.723716* | 79.30102* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 45 M^3 /45 MTR | KATHAMAU | 26.723716* | 79.30102* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL/16 Mtr | KATHAMAU | 26.723716* | 79.30102* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.956 | |
| 2 | HDPE | 75 | 2.126 | |
| 3 | HDPE | 90 | 1.503 | |
| 4 | HDPE | 110 | 2.497 | |
| 5 | HDPE | 140 | 2.341 | |
| 6 | HDPE | 160 | 0.722 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 647 |