Project Completion Certificate (Ground Water)
Scheme ID: 20014838 Name of Scheme: BARKAPUR PWS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 01-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 15.0 Mtr./64.54 Mtr. Barka Purwa 26.752337 79.556495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (21.2 M3/Hr.)/42Mtr. Barka Purwa 26.752337 79.556495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Barka Purwa 26.755282 79.537003
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 .010
2 D.I. 150 .003
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.76
2 HDPE 75 0.302
3 HDPE 90 0.157
4 HDPE 110 1.176
5 HDPE 140 0.206
HSC Connection
Sno. Total Nos.
1 221
Other Details
1.28
1.33
1.33
10-May-2023
10-Aug-2023