| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014067 | Name of Scheme: MADHONAGAR GRAMIN PEYJAL YOJNA W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2023 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 15-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe 150 mm Dia | 107.92 | Madhonagar | 27.018905 | 79.685324 |
| 2 | Plain Pipe 200 mm Dia | 60.41 | Madhonagar | 27.018905 | 79.685324 |
| 3 | Slotted Pipe 150 mm Dia | 21.02 | Madhonagar | 27.018905 | 79.685324 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 500/62 | Madhonagar | 27.018905 | 79.685324 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn-Al Tank | 100/12 | Madhonagar | 27.018905 | 79.685324 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 150 | 0.0053 | |
| 2 | DI Pipe | 100 | 0.0245 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution Pipe/HDPE | 63 | 2.203 | |
| 2 | Distribution Pipe/HDPE | 75 | 0.5346 | |
| 3 | Distribution Pipe/HDPE | 110 | 0.4428 | |
| 4 | Distribution Pipe/HDPE | 125 | 0.038 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 309 |