| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012832 | Name of Scheme: AKODIYA WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3831 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Jul-2025 | Actual Date of Completion (Capex): 28-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TW | 27/139.39 | Akodiya | 25.798615 | 81.887611 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 39/54 | Akodiya | 25.798615 | 81.887611 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/16 | Akodiya | 25.798615 | 81.887611 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 125 | 0.0125 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.524 | |
| 2 | HDPE | 75 | 0.9503 | |
| 3 | HDPE | 90 | 0.6552 | |
| 4 | HDPE | 140 | 3.1947 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 580 |