Project Completion Certificate (Ground Water)
Scheme ID: 20012560 Name of Scheme: BHUWALPUR KILA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 4008 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Aug-2025 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/90.54 Bhuwalpur Kila 25.874885 81.930765
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 34/56 Bhuwalpur Kila 25.874885 81.930765
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Bhuwalpur Kila 25.874885 81.930765
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.0476
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.605
2 HDPE 75 0.257
3 HDPE 90 1.434
4 HDPE 110 0.7658
5 HDPE 140 0.676
6 HDPE 160 0.7398
HSC Connection
Sno. Total Nos.
1 390
Other Details
3.30
0.00
0.00
01-Jan-2026
02-Jan-2026