Project Completion Certificate (Ground Water)
Scheme ID: 20012484 Name of Scheme: Khanigawan Khurd No. of Villages: 5 No. of Habitation Covered: 7
Total Population Covered: 3910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 07-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26 M/ 129.8 M Khanigawan Khurd 27.404192 80.919892
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.9 M³ per Min /45Mtr Khanigawan Khurd 27.404192 80.919892
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 16 Mtr Khanigawan Khurd 27.513345 80.21928
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01925
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 8.550
2 HDPE Pipe PN-6, Class PE-100 75 3.603
3 HDPE Pipe PN-6, Class PE-100 90 8.268
4 HDPE Pipe PN-6, Class PE-100 125 1.512
5 HDPE Pipe PN-6, Class PE-100 140 1.031
6 HDPE Pipe PN-6, Class PE-100 160 0.459
7 HDPE Pipe PN-6, Class PE-100 200 0.059
HSC Connection
Sno. Total Nos.
1 602
Other Details
3.49
0.00
3.24
06-Jan-2024
25-Dec-2024