Project Completion Certificate (Ground Water)
Scheme ID: 20012474 Name of Scheme: GANGAULI No. of Villages: 4 No. of Habitation Covered: 11
Total Population Covered: 3670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 01-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24Mtr/ 82Mtr GANGAULI 27.378607 79.954107
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.9 M³ per Min /45Mtr GANGAULI 27.378607 79.954107
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/ 18Mtr GANGAULI 27.378595 79.378595
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Pipe 150 0.01774
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.52
2 HDPE Pipe PN-6, Class PE-100 75 5.91
3 HDPE Pipe PN-6, Class PE-100 90 2.12
4 HDPE Pipe PN-6, Class PE-100 110 0.74
5 HDPE Pipe PN-6, Class PE-100 125 2.07
6 HDPE Pipe PN-6, Class PE-100 140 0.07
7 HDPE Pipe PN-6, Class PE-100 160 2.20
8 HDPE Pipe PN-6, Class PE-100 200 2.13
HSC Connection
Sno. Total Nos.
1 443
Other Details
3.29
0.00
3.37
01-Apr-2024
24-Dec-2024