Project Completion Certificate (Ground Water)
Scheme ID: 20012457 Name of Scheme: SUNAUWA PATTIPUR No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2720 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Jan-2022 Actual Date of Completion (Capex): 26-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 21.06Mtr/ 108.22Mtr SUNAUWA PATTIPUR 27.357097 80.436996
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7M3/Min /45Mtr SUNAUWA PATTIPUR 27.357097 80.436996
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 18Mtr SUNAUWA PATTIPUR 27.350095 80.439653
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01913
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.652
2 HDPE Pipe PN-6, Class PE-100 75 1.756
3 HDPE Pipe PN-6, Class PE-100 90 0.878
4 HDPE Pipe PN-6, Class PE-100 110 0.325
5 HDPE Pipe PN-6, Class PE-100 125 1.075
6 HDPE Pipe PN-6, Class PE-100 180 2.814
7 HDPE Pipe PN-6, Class PE-100 200 0.633
HSC Connection
Sno. Total Nos.
1 413
Other Details
2.41
0.00
2.48
09-Jan-2024
24-Dec-2024