Project Completion Certificate (Ground Water)
Scheme ID: 20012431 Name of Scheme: BARWALIYA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2741 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Sep-2025 Actual Date of Completion (Capex): 24-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.04/204.46 Atuliya 25.805924 81.413603
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 28/55 Atuliya 25.805924 81.413603
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Atauliya 25.805924 81.413603
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 80 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.8374
2 HDPE 75 0.423
3 HDPE 110 1.469
4 HDPE 140 3.032
HSC Connection
Sno. Total Nos.
1 480
Other Details
2.08
0.00
0.00
24-Jun-2025
25-Jun-2025