Project Completion Certificate (Ground Water)
Scheme ID: 20012429 Name of Scheme: KHAKHAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3680 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2025 Actual Date of Completion (Capex): 28-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TW 6/172.59 Khakhapur 25.685519 82.070967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 38/55 Khakhapur 25.685519 82.070967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Khakhapur 25.685519 82.070967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.290
2 HDPE 75 0.16
3 HDPE 90 1.095
4 HDPE 110 0.4198
5 HDPE 140 2.508
6 HDPE 160 0.952
HSC Connection
Sno. Total Nos.
1 525
Other Details
0.00
0.00
0.00
18-Oct-2025
18-Dec-2025