Project Completion Certificate (Ground Water)
Scheme ID: 20012409 Name of Scheme: Bihra No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Jul-2023 Actual Date of Completion (Capex): 14-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27 M / 99.72 M Bihra 28.561419 77.917315
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 525 LPM / 47 M Bihra 28.561419 77.917315
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 12 M Bihra 28.561512 77.917213
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.78
2 HDPE 75 0.25
3 HDPE 90 0.94
4 HDPE 110 0.30
5 HDPE 140 0.034
HSC Connection
Sno. Total Nos.
1 505
Other Details
1.88
1.87
1.89
10-Jan-2026