Project Completion Certificate (Ground Water)
Scheme ID: 20012319 Name of Scheme: TIKARI No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 8010 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 08-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36 M/ 109.8 M TIKARI 27.231425 80.379261
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.49 M³ per Min /45Mtr TIKARI 27.231425 80.379261
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 500 KL/ 18 Mtr TIKARI 27.229287 80.375509
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02674
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 12.674
2 HDPE Pipe PN-6, Class PE-100 75 9.564
3 HDPE Pipe PN-6, Class PE-100 90 6.064
4 HDPE Pipe PN-6, Class PE-100 110 3.997
5 HDPE Pipe PN-6, Class PE-100 125 1.911
6 HDPE Pipe PN-6, Class PE-100 160 2.540
7 HDPE Pipe PN-6, Class PE-100 180 1.842
8 HDPE Pipe PN-6, Class PE-100 200 0.751
HSC Connection
Sno. Total Nos.
1 1058
Other Details
5.11
0.00
5.01
07-Dec-2023
24-Dec-2024