Scheme ID: 20012247 Name of Scheme: Nagla Karan WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3143 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 20-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30.28 M/48.29 M Nagla Karan 28.476516 77.931021
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM/47 M Nagla Karan 28.476516 77.931021
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/12 M Nagla Karan 28.476516 77.931129
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.03
2 HDPE 75 0.44
3 HDPE 110 0.16
4 HDPE 140 0.053
5 HDPE 160 0.31
6 HDPE 90 0.20
HSC Connection
Sno. Total Nos.
1 606
Other Details
2.17
2.06
2.06
15-Jan-2026
16-Jan-2026