Project Completion Certificate (Ground Water)
Scheme ID: 20011969 Name of Scheme: Dubauli No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3890 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Oct-2023 Actual Date of Completion (Capex): 24-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.09/113.49 Dubauli 26.5619 83.5452
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 51/39 Dubauli 26.5619 83.5452
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 250/12 Dubauli 26.5619 83.5452
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.012 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.67 Laying Completed
2 HDPE 75 5.407
3 HDPE 90 1.045 Laying Completed
4 HDPE 110 1.483 Laying Completed
5 HDPE 140 0.931 Laying Completed
6 HDPE 160 0.062 Laying Completed
HSC Connection
Sno. Total Nos.
1 680
Other Details
2.76
0.00
2.62
19-Nov-2024
25-Sep-2025